How to Install NRS MaverIK Foot Braces

Materials

  • Foot braces set
    • (2) Keepers Footpad
    • (2) Keepers Rail
    • (2) Foot Brace Pocket Patch
    • (2) Foot Brace Loop Patch
  • Pint of Clifton Adhesive
  • Roller Rasp or Pro Roller
  • Toluene or Rubbing Alcohol
  • 150–180 Grit Sandpaper
  • Pencil
  • Lint-free towel

Instructions

  1. With boat inflated, determine the positioning of the patches: Standard positioning aligns the top of the plastic rail with the bottom of the 1-1/2" overlap of material.
  2. Clean the gluing area thoroughly with rubbing alcohol or Toluene.
  3. Trace the outline of the positioned patches with a pencil.
  4. Buff inside the outline with sandpaper, to remove the shine from the material's surface. Patches are pre-buffed.
  5. Deflate boat. Follow standard gluing procedures included with the adhesive.

Clifton Hypalon® Adhesive Instructions

NRS IK Performance Pack  Instructions
NRS IK Performance Pack  Instructions
Placement for Optional Thigh Straps
(Requires 4ea of 1" D-ring Patch and 1 pr of Thigh Straps)